South Veterans Parkway Project Segments
What's that noise? Pile driving for bridge construction over 85th Street begins July 17, 2023.
Visit our Construction details page to learn more about pile driving, truck hauling, and other ongoing construction activities.
South Veterans Parkway will connect I-29 to the previously completed Veterans Parkway. Construction on the first of four segments begins in 2023.
Overview
Veterans Parkway will be the same as the section constructed north of Arrowhead Parkway. In general, the new roadway will consist of:
- Three lanes per direction
- A 32-foot raised median separating the travel lanes
- Shared use path along the south side of the Parkway
- Grass boulevard separating the path from the roadway
The speed limit along Veterans Parkway will be posted at 55 mph.

Construction
Segment 1: Western Avenue to Cliff Avenue
Components:
- A pedestrian underpass will be installed west of Minnesota Avenue.
-
Traffic signals compliant with the Americans with Disabilities Act (ADA) will be installed at the intersections of Veterans Parkway and:
- Western Avenue
- Minnesota Avenue
- Cliff Avenue
Construction Timeline
- Construction Begins spring 2023
- Dirt Work, Utilities and road work on Cliff Avenue during spring 2023
- Road Work from winter 2023 through the fall 2024
Design (Future Construction)
Segment 2: I-29 to Western Avenue
Design: Anticipated design complete in summer 2023.
Construction Timeline: Construction anticipated spring 2024 - fall 2025.
Components:
-
Pedestrian underpasses will be installed between:
- Tallgrass Avenue and Louise Avenue
- Louise Avenue and Western Avenue near Harrisbug schools
-
ADA-compliant traffic signals will be installed at the intersections of Veterans Parkway and:
- Albers Avenue
- Tallgrass Avenue
- Louise Avenue
Segment 3: Cliff Avenue to Sycamore Avenue
Design: Anticipated design complete in summer 2024.
Construction Timeline: Construction anticipated spring 2025 - fall 2026.
Components:
-
Pedestrian underpasses will be installed between:
- Cliff Avenue and Southeastern Avenue
- Southeastern Avenue and Sycamore Avenue
-
ADA-compliant traffic signals will be installed at the intersections of Veterans Parkway and:
- Southeastern Avenue
- Sycamore Avenue
- An overpass will be installed at the BNSF railroad.
Segment 4: Sycamore Avenue to 57th Street
Design: Anticipated design complete in summer 2025.
Construction Timeline: Construction anticipated spring 2026 - fall 2027.
Components:
-
Pedestrian underpasses will be installed between:
- Sycamore Avenue and 69th Street
- 69th Street and 57th Street
-
ADA-compliant traffic signals will be installed at the intersections of Veterans Parkway and:
- 69th Street
- 57th Street